LM Manufacturing

Detroit, MI

About this Project

Working closely with LM Manufacturing and Bedrock Detroit, Premier Construction & Design fully leveraged our integrated project delivery process to complete this very time sensitive project in less than a year from concept to completion!  Design and Construction work included the renovation over 265,000 SF of existing manufacturing/warehousing space and the new construction of a 33,000 SF addition connecting the existing facilities.  Premier’s fully integrated design, engineering, and construction solution included the following work:

  • Fully developed design including all required certifications and permits

  • Upgrade of fire suppression systems to ESFR

  • Ceiling (30’) to floor repaint of entire facility including color coding

  • Complete floor refinishing including epoxy and clear coating systems

  • Complete demolition, rework and rebuild of production floor restrooms

  • Troubleshooting and replacing components for 20 truck docks and wells and 40 entrances/exits 

  • Complete renovation of 21,000 square feet of offices including:

    • Bathrooms

    • Kitchen/break areas

    • Conference/huddle areas

    • Server rooms with specialty fire suppression

    • Private and Open office areas

  • Renovation of Cafeteria 

  • Build out of Quality control laboratories 

  • Extensive site work including

    • New pedestrian, passenger and truck entrances 

    • Complete mill/repave/striping of all parking areas

    • New underground storm water retention

    • New concrete curbs, walks, and paving for production area truck turning, parking and security required for quick production turnaround times

  • Upgraded exterior and interior lighting and controls

As a joint venture between LM Manufacturing and Magna International, this project was a part of the push to bring automotive manufacturing back into the city of Detroit and Premier couldn’t be more honored to have been a part of the team to make it happen! 