LM Manufacturing
Detroit, MI
About this Project
Working closely with LM Manufacturing and Bedrock Detroit, Premier Construction & Design fully leveraged our integrated project delivery process to complete this very time sensitive project in less than a year from concept to completion! Design and Construction work included the renovation over 265,000 SF of existing manufacturing/warehousing space and the new construction of a 33,000 SF addition connecting the existing facilities. Premier’s fully integrated design, engineering, and construction solution included the following work:
Fully developed design including all required certifications and permits
Upgrade of fire suppression systems to ESFR
Ceiling (30’) to floor repaint of entire facility including color coding
Complete floor refinishing including epoxy and clear coating systems
Complete demolition, rework and rebuild of production floor restrooms
Troubleshooting and replacing components for 20 truck docks and wells and 40 entrances/exits
Complete renovation of 21,000 square feet of offices including:
Bathrooms
Kitchen/break areas
Conference/huddle areas
Server rooms with specialty fire suppression
Private and Open office areas
Renovation of Cafeteria
Build out of Quality control laboratories
Extensive site work including
New pedestrian, passenger and truck entrances
Complete mill/repave/striping of all parking areas
New underground storm water retention
New concrete curbs, walks, and paving for production area truck turning, parking and security required for quick production turnaround times
Upgraded exterior and interior lighting and controls
As a joint venture between LM Manufacturing and Magna International, this project was a part of the push to bring automotive manufacturing back into the city of Detroit and Premier couldn’t be more honored to have been a part of the team to make it happen!